Precast Manufacturing Company has been working together with Petillo Incoporated on many portions of the I-78 Logistics Park project.  The PMC team has designed and produced many of the detention basin components.  Please check out some of our design drawings and In field pictures.

Precast Concrete Headwalls

Plans are attached here for informational purposes only to be used as a visual aid.

Precast Concrete Intake Structure

Plans are attached here for informational purposes only to be used as a visual aid.

Precast Manufacturing 3D Rendering of the Dam System

A view of the Dam in progress.

6' x 6' Culvert

Plans are attached here for informational purposes only to be used as a visual aid.

The Pond Lining in progress by Petillo, Inc.

Stilling Basin, field poured by Petillo, Inc. and connected to the 6′ x 6′ Culvert provided by Precast Manufacturing Company.

Precast Concrete 16'x8' Culvert with Outfalls

16′ x 8′ culvert construction in process.

Plans are attached here for informational purposes only to be used as a visual aid.

Precast Box Culvert staged at Precast Manufacturing plant facility in Phillipsburg NJ.

Petillo Inc. offloading a section of precast concrete headwall in the I-78 Logistics Park detention pond #502.

DOT Route 22 Intersection